FAQs
More FAQs- Is drying and curing the same thing?
- How long will it take to have my hard floors coated with urethane?
- Isn’t acrylic finish expensive?
No. Drying means that the surface layer is no longer wet or damp to the touch. Curing, on the other hand, means that acrylic has reached its maximum hardness thereby providing the necessary protection of your flooring.
Preparation will depend on the condition of the existing floor, current number of coats, repairs required, etc. The coating application can be accomplished at a rate of 750 square feet per hour with a two-person crew.
Acrylic finish is generally less expensive than other finishes. However, multiple coats may be necessary to achieve the level of gloss and level of protection you desire